Hybrid proposal readiness
Customer inputProject Records
The technical and commercial record set that keeps design, installation and ownership aligned.
A complete hybrid project should leave a traceable record from survey through commissioning. Drawings, calculations, datasheets, settings, tests, serial numbers and warranties help the owner understand the scope and support future maintenance.
Collect
Gather complete and legible inputs
Verify
Check the site, equipment and current process
Record
Keep confirmed decisions in the project file
Why It Matters
How this information affects design, approval, cost and project reliability.
- Hybrid projects combine PV, battery, grid and backup circuits that future technicians must understand.
- As-built records reduce unsafe assumptions during service or expansion.
- Warranty support depends on product, serial-number and commissioning evidence.
- A defined backup scope prevents disagreement about which loads should run during outages.
Complete Checklist
Everything that should be collected or confirmed for this readiness topic.
- Site survey report and roof photographs.
- Shade observation or study and final module layout.
- Single-line diagram showing grid, PV, inverter, battery, meter and backup DB.
- PV string and MPPT allocation.
- Critical-load schedule and battery-sizing assumptions.
- Equipment datasheets, approved compatibility evidence and warranties.
- Protection schedule, earthing details and cable schedule.
- Commissioning tests, settings, firmware versions and monitoring screenshots.
- Serial-number register and installation photographs.
- Final quotation and scope exclusions.
Verification Process
The practical sequence used to review and confirm the information.
- Check that proposal, drawings and installed equipment use the same capacities and models.
- Update design drawings to final as-built conditions.
- Verify all serial numbers, warranties and monitoring accounts.
- Record inverter mode, battery reserve and grid/export settings.
- Confirm test records and customer training before final handover.
Common Issues to Avoid
Frequent gaps that cause redesign, delay, rejection or unrealistic expectations.
- A sales quotation is treated as the complete technical design.
- Drawings are not updated after site changes.
- Battery compatibility or warranty conditions are not included.
- No record exists of inverter settings or backup reserve.
- Customer receives app access but not installer contacts, alarm guidance or shutdown steps.
Records Produced
The documents or outputs that should remain in the final project file.
- Approved design pack.
- As-built drawing pack.
- Commissioning and inspection file.
- Warranty and serial-number register.
- Monitoring and settings handover.
- Operation, maintenance and emergency guidance.
Ready When
The completion conditions that allow the proposal to move forward confidently.
- Installed equipment matches the approved design or documented revisions.
- As-built single-line and layout drawings are complete.
- Tests, settings and backup behavior are recorded.
- Warranties, serial numbers and monitoring ownership are handed over.
- The owner understands scope, exclusions, alarms and shutdown procedure.
Important planning note
Keep copies of critical records outside the monitoring portal so they remain available after account, installer or internet-service changes.